The OCMAPS Technology Plan
serves as a guide for the OCMAPS funding of technology
into the Oklahoma City Public Schools District. The
OCMAPS Program anticipates the expenditure of
approximately $52,000,000 for both sales tax and bond
technology projects.
This
plan was developed from information provided by the School
District after a district-wide technology plan was
developed. It is divided into Sales Tax and Bond
projects. Sales Tax projects will be managed by the
OCMAPS Trust, and Bond Technology Projects will be managed
by the School District in accordance with the Memorandum
of Understanding terms regarding management of projects by
the OCMAPS Trust.
GOALS
The
following goals are part of the district-wide Oklahoma
City Public Schools Technology Plan:
·
Improve
access to technology by decreasing the student to computer
ratio.
·
Improve
teacher, student, and parent communications through the
implementation of classroom presentation stations, access
to printers and implementation of classroom phones.
·
Improve
classroom performance through the implementation of a
Library Automation System and an Interactive Classroom
Performance System.
In
addition, the following goals will be achieved by the
OCMAPS Technology Plan through the implementation of the
projects:
·
Implement
fully functional systems that directly benefit the
students and teachers in the classroom.
·
Ensure good
management practices and high ethical standards in the
acquisition and implementation of technology projects.
SCHOOL DISTRICT
RESPONSIBILITIES
In
order for the projects to function, the following
infrastructure must be provided and maintained with
alternate funding and management:
·
The network
infrastructure required for communications between devices
and facilities.
·
Required
servers and server-based applications including
telecommunications support equipment.
·
The school
district owns approximately 550 existing switches. These
switches will be reused along with the new switches
purchased with Sales Tax funds to complete the network
infrastructure.
·
Maintenance
on all provided equipment, including batteries, printer
and paper supplies, maintenance, repairs and consumables
outside of initial warranty.
·
Maintenance
on software license upgrades, including operating systems
and office products after the initial installation.
·
Ensure the
continued integrity of newly installed network systems by
maintaining established standards for wiring and network
devices.
·
Any
computers implemented in a school before the scheduled
OCMAPS renovation will use existing School District
resources for support.
ACQUISITION OF EQUIPMENT
The
projects in the OCMAPS Technology Plan may be acquired
through existing annual contracts or a Request For
Proposal process, both which will include competitive
bidding procedures. It is possible that some of the items
in this plan will be purchased with School District E-Rate
or other funds.
When
all projects in this plan are purchased and implementation
is complete, any remaining funds may be used for
additional projects. This plan may be amended from time
to time to allow for a change in technology or to modify
projects if needed.
SALES TAX PROJECTS
The
following projects will be implemented on a prioritized
basis over several years. The primary objective of the
sales tax projects is to provide technology at the student
level in all schools across the School District. The
projects include the following:
Wireless Mobile Labs
Provide every school with 2 carts (24 laptop computer
capacity), laptop computers to fill the carts, and a
network printer on each cart. This complete solution will
conveniently provide technology to students and ensure
easy access to powerful mobile computers and Internet
resources. Instead of students having to move from the
classroom to the computer lab to use the latest
technology, they will have more time to concentrate on
their school assignments. Mobile labs will be implemented
in the elementary schools during Phase 1 and 2, the middle
and high schools in Phase 3 and the school centers in
Phase 4. Twenty-four new laptops per school will be
provided in Phase 6.
Network Printers
A
multi function printer will be purchased to handle volume
printing for every 10 classrooms, with at least one
printer per floor and all schools receiving at least two
printers. Each classroom will be integrated to ensure
network connectivity to the printer to allow printing from
every classroom. Teachers will be able to use laptops to
print materials needed for class instruction and all other
networked computers in a classroom will be connected to
the a printer. Implementation is planned in Phase 1 and
2.
Presentation Stations
A
presentation station will consist of a 54” rolling cart, a
27” monitor, a desktop scanner, and the security locks for
the devices. The teachers will connect laptops to the
presentation stations in order to display Power Point
Presentations, Internet sites and other digital
information to integrate technology into the classroom.
This project also includes IP/TV equipment so that video,
cable, satellite one, or on-demand broadcasts can be
displayed on the presentation station monitors. IP/TV
delivers live, high-quality video content to desktops,
classrooms and meeting rooms over the network. Since the
IP/TV solution is based on network-efficient multicast
technology, the School District can take advantage of
quality streaming video that offers total control over
bandwidth and network performance. Presentation stations
will be implemented in half the classrooms throughout the
School District in Phase 1 and 2. Phase 5 will complete
the IP/TV portion of the project.
New Desktop Computers
All
schools will receive new desktop computers in all Phases
(excluding Phase 6) for classrooms, libraries and
offices. The School District will assist in prioritizing
schools to receive the computers in each phase. Computers
will be purchased pre-configured to ensure consistency in
hardware and software in all school facilities.
All
classrooms will receive 1 computer in Phases 1 through 5.
Typical elementary schools will receive 4 computers in the
library and 3 computers in offices. Typical middle
schools will receive 4 computers in the library and 6
computers in offices. Typical high schools will receive
14 computers in the library and 10 computers in offices.
No new computers are planned in Phase 6.
All
classrooms will receive 2 additional computers in Phase 7
through 9. Typical elementary schools will receive 3
additional computers in the library and 3 additional
computers in offices. Typical middle schools will receive
3 additional computers in the library and 6 additional
computers in offices. Typical high schools will receive 5
additional computers in the library and 10 additional
computers in offices.
High
schools will receive more computers for the offices than
the middle and elementary since a typical high school has
more administrative personnel and counselors.
Software
·
Anti-Virus
This
software will provide protection against viruses, hackers
and privacy threats on the network and the computers
throughout the School District. Implementation will be
achieved in Phase 1 and 2.
·
Reading Software (Star
Reader and Accelerated Reader)
Accelerated Reader and Star Reader are software programs
that can quiz students and give teachers and students
direct feedback. Star Reader is evaluation software that
determines a students reading level by their quiz
results. The students take the computer based quizzes
throughout the year to determine improvement. Accelerated
Reader will quiz students on books they just read and
assist students with reading comprehension. Two network
servers will also be purchased for the management of this
software. Implementation will be achieved in Phase 1 and
2.
Library Automation System Update
This
project will provide all students, parents, and teachers
the ability to look at a school’s catalog of books from
any location via the Internet. It will also include a
student database that will track student information from
any school within the School District. Two new computers
will be purchased for each library in every school. One
will be used for the check out station and the other to
review the catalog. Two network servers will be purchased
for the management of the Library Automation System. This
project will be implemented in Phase 1 and 2.
Network Equipment
This
project will purchase the necessary network equipment for
all schools that are planned to open after construction
work is complete. It includes switches, patch cords and
uninterruptible power supplies. This project will be
implemented in all phases.
Classroom Phones
Every classroom will receive a phone. Phones and routers
will be purchased for schools as they are planned to open
after construction work is complete. It is anticipated
that the School District will provide the VoIP call
manager server with Bond Funds. This project will be
implemented in Phase 1 through 8. |